Welding work log (Appendix B according to SP 70.13330.2012)


The welding log is an important document in the work of professional builders. In this register, the employee keeps records of all welding work carried out at the site. Only a welder of the third category and higher has the right to conduct it. The order for its maintenance is issued by the manager and signed by the employee who is assigned to maintain it.

  • Form and sample
  • Online viewing
  • Free download
  • Safely

FILES

The obligation to keep a log of welding work must be specified in the employment contract or the employee’s job description. Labor legislation in this case makes it clear that inattention is unacceptable here. After all, the level of responsibility during all construction, in particular welding, work is colossal.

Welding log function

The main objective of the document is to control the implementation of complex technological processes associated with the manufacture of metal structures.

The journal helps you keep track of the following:

  • compliance by employees with safety regulations and requirements for workplace organization;
  • following the procedure for carrying out the welding work itself;
  • compliance by employees with technological requirements for the speed of joint formation and the quality of the seam.

The welding log is considered a type of executive document.

Its presence at production or construction sites is mandatory.

Documentation is classified depending on its purpose:

  1. Logbook for monitoring and checking the quality of welding processes. Helps monitor the work of welders on drilling rigs, power plants, and other important facilities.
  2. Book of accounting of certain types of welding, for example, argon arc. Necessary to monitor compliance with the requirements for this type of work.

The document has full legal force. In case of investigation into the causes of emergency situations, papers are provided to the court.

We recommend that you read

You can also read an article about technological maps for welding work.

Welding log appendix

In addition to the main pages of this regulatory document, it contains a special appendix for posting information about tolerances with a standard example of filling out welding journal formats.

For example, only employees over 18 years of age and having the following documents can be allowed to work with welding units:

  • medical examination;
  • records of technical mastery of the profession;
  • records of completion of all mandatory types of training;
  • passing examination tests with notes on grades and comments;
  • description of practical training courses.

In addition to these specialized records, the application must contain all marks of completion of training and safety instructions and first aid courses.


Appendix to the welding log.

Additionally, the application should describe any factors affecting the welder during the work process.

Here's what a welder may be exposed to during the welding process:

  • high risk of electric shock or arcing;
  • burns of various locations and pathological effects of high temperatures;
  • exposure of exposed skin to molten drops of metal and sparks;
  • radiation effect;
  • X-ray irradiation during the isotope welding method or welding of the isotopes themselves;
  • negative effect of fields with different polarities in the electromagnetic field;
  • damage to the respiratory tract due to inhalation of combustion products of oxides and electrodes;
  • the effect of ionized air, harmful to the lungs;
  • harm from loud noise;
  • the effect of pronounced vibration;
  • possible cuts from sharp edges and edges of welded workpieces.

Specific factors affecting the human body when working with synthetic materials and gas spraying are as follows:

  • high-frequency electromagnetic fields with frequent and rapid pole changes;
  • exposure to toxic substances released during combustion such as ethylene oxides, formaldehydes, acetone vapors, solvents, etc.

The format of the document can change; it is ordered from the printing house in accordance with the wishes of the customer - the enterprise. In addition, it must comply with generally accepted standards and technical regulations for industrial safety.

Businesses that neglect the rules and do not keep logs may be subject to serious penalties from government inspection bodies. If the disorder in the journal depends on a specific employee, he can be punished up to and including dismissal.

Who is responsible for filling it out?

Each team of workers fills out a welding logbook separately. Even if there are several groups of employees at the site, each of them creates its own document.

After completing work on the site, employees hand over the log.

Marks are given by the following persons:

  • welders;
  • master responsible for welding;
  • representative of the controlling organization.

Recommended reading Information about the welding arc and how it works

Maintaining documentation is regulated by legislative acts. Persons who refuse to fill out a welding log are subject to sanctions, including dismissal or a large fine.

Procedure for filling out the welding log

There is a mandatory scheme for filling out a welding log, according to which entries are made about the following facts:

  • date of completion of work indicating the shift;
  • a list of parts and workpieces with which welding was performed, indicating steel grades and other consumables;
  • area or workplace of parts and workpieces that are welded;
  • marks with personal signatures of acceptance and delivery of an industrial or construction facility for welding work;
  • welding method and type of consumables;
  • meteorological conditions under which welding work is carried out;
  • personal data of the welder, his ID number;
  • stamp data;
  • personal signature of the responsible work manufacturer;
  • personal data of the senior foreman responsible for the entire facility;
  • if necessary, note any additional checks and personal comments.


An example of a completed journal.
In addition to the signatures of managers and numbered pages, the official seal of the organization where the document is maintained and metal processes are carried out must be affixed.

ZhSR form and sample

The document is a thin stack of forms, numbered, stitched and certified with the seal of the enterprise.

The accounting book forms vary, but the following sections are required:

  • title page;
  • sheet with data of engineering and technical personnel;
  • a form with a list of welders working at the site;
  • quality control tables for welded joints.

In addition to standard sections, the welding journal includes a large amount of clarifying data:

  • names of project documents and enterprises that approved the papers;
  • list of welded metal structures;
  • description of types and markings of seams;
  • operating parameters of gas or electric welding machines (prescribe brands of individual equipment components, types of consumables used);
  • types of defects identified, methods used to eliminate deficiencies;
  • notes on detected cases of violation of the technological map of welding works.

A sample of filling out the ZhSR, shown in the photo, will help you understand what the document should look like.

Entering test results

In everyday practice, control is carried out mainly visually. An external inspection of the seam by a professional allows you to see defects on the resulting surface, the dimensions of which exceed 0.1 mm. The presence of inclusions of oxidized alloys is noticeable.

A more thorough inspection using fluorescent color examination can detect capillaries emerging to the surface. Internal cavities of minimal size can be identified through radiation, magnetic, and acoustic tests. It is impossible to control welding work every time using these methods.

The analysis is carried out selectively, with a frequency determined by management and inspecting organizations. The results of control tests are drawn up in a form that complies with the standards. Inspection data is also recorded in a log.

Sections and their completion

The log of work on welding metal and PE (polyethylene) structures consists of separate blocks.

Title pages

The initial page contains complete information about the production site and the enterprises operating on it.

A standard title page includes the following elements:

  • name, legal form of the subcontractor organization;
  • description of a construction or industrial facility;
  • data of the employee responsible for maintaining housing and communal services;
  • information about designers, types of technical documentation;
  • registration code for installation or welding work;
  • data from the manufacturer of the metal structures being welded, inspection acceptance mark;
  • last name, first name, patronymic of the Gostekhnadzor representative;
  • start and end dates of document maintenance.

The first page is completed by the person identified by the contractor. Welders enter only technical information about the work being carried out.

List of technical engineers

The list includes data from employees responsible for quality control of technological processes. The list may consist of several names, but most often only 1 engineer is indicated.

We recommend reading: How to make sliding gates yourself

The building regulations establish the requirements for such an employee. The project manager is the director of the construction company or the chief engineer.

Team of welders performing the work

This section includes the following data:

  1. General information. Full names, qualifications, numbers and validity periods of employee IDs are recorded.
  2. Permit data. A list of works that can be performed by certain welders is indicated. Processes can be standard, low-level, or high-altitude.
  3. A note on completed tests. The welder provides the samples he has made, and the inspector evaluates the quality of the seams made, indicating the score received.
  4. Welder's mark. Installed when performing critical work, for example, welding pipelines or tanks operated under high pressure. The number of the specialist’s personal mark is entered in the journal.

Main work table

The page is divided into 13 columns, when filling out which the following order is observed:

  1. The first column contains the date the work was completed and the work shift number. In the case of welding in the daytime, put the number 1, in the evening - 2, at night - 3.
  2. The second column contains markings and names of parts being welded. Each welder is responsible for the quality of the welds made.
  3. The third column describes the joints and the numbers of welded units. Marking is indicated according to the drawing of the object (block).
  4. The fourth column should contain the receiver's mark. After its installation, the construction stage is considered completed.
  5. The fifth column contains data on the electrodes used and filler wire. The brand and batch number of consumables are indicated.
  6. The sixth column (climatic conditions) in a simplified format contains only temperature. Sometimes the presence of precipitation, strong wind or frost is prescribed. The latter option is preferable, because when investigating the causes of an accident, the smallest details are important.
  7. The seventh column contains information about the welder.
  8. The next 3 columns contain the name, signature, and mark number of the master responsible for compliance with the technology.
  9. Columns 11-13 are led by the receiver. The specialist gives an assessment, signature, and, if necessary, indicates any comments.

We recommend reading: How to cut metal edges for welding

End of the magazine

The last page of the document indicates the total number of sheets. The data of the head of the enterprise that issued the journal is written down and his signature is affixed. The organization's seal is placed at the bottom of the page.

Rating
( 2 ratings, average 4 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]